References
- Water management constructions
- Transport constructions
- Ecological constructions
- Ground works, demolitions
Water management constructions
YEAR 2007
Lubnik, erosion control construction
Construction of the complete flood pool including emergency weir, relocation of HV installations, greenery setting.
Volume of work ca CZK 8.0 million
Lesetinsky Stream
construction of flood controls – earth fill dam and reinforced concrete dam, gradient of stonework, construction of a new road.
Value: 14 mill. CZK
Mnisi Stream
regulation and adaptation of stream course, pavement of quarry stone, walls of face work, stone thresholds, rockfill (chinking),
value: 3 mill. CZK
RN Ramaska
complex construction if a new water reservoir,
value: 3 mill. CZK
Kreslicky Stream
complete construction of flood controls – wire and stone dams, stone dams of face work, rockfill (chinking), riprap, stream course adaptation,
value: 6 mill. CZK
HB Nelepec
flood controls – wire and stone course reinforcement, stone dams of face work,
value: 2,5 mill. CZK
YEAR 2006
Revitalization project in Dukovany flood plain
Complete construction of a new reservoir incl. emergency weir and pool, riverbed training
Volume of work ca CZK 2.5 mill.
Click for photo
HB Vavrovsky stream
Water stream training, sediment removing, training of the stream bed, facework, rockfill of quarry stone
Volume of work ca 2 mill. CZK
HB Plenkovicky stream
Water stream training, slope stabilization, rockfill of quarry stone, revegetation
Volume of work ca CZK 1 mill.
Lateral canal Vranany-Horin, repair of bank protection
repair and refilling of the backfill foot, refilling of scours and depressions in the banks, repair and extension of stone pavement, stone backfilling, new pavement of concrete embedded quarry stone, approx. 6 thousand m2
Volume of work: CZK 8 mill.
Right-hand bank of the river Ricky, km 29,000-RN, km 2,650
Construction of the complete flood pool, incl. emerg. weir, water stream training, sediment removing, riverbed training, quarry stone backfill, revegetation
Volume of work ca CZK 2 mill.
HB Flood pool Podbrdi, Podkopna Lhota
Construction of the complete flood pool
Volume of work ca CZK 4 mill.
OHB Boracsky stream
Repair of the stream bed, sediment removing, repair of the existing pavement, construction of the new stone damming
Volume of work ca CZK 3 mill.
MVN Vavrinec renovation
Renovation of the reservoir in the village, volume of work ca CZK 1 mill.
HB Lazanka in Lazany
Repair of the stream bed, repair and extension of the existing stone pavement, stream cleaning, replacement of grassing blocks, renovation of stone weir.
Volume of work: ca CZK 5 mill.
OHB Vrbovec
Oprava koryta potoka, oprava a doplneni stavajicich kamennych dlazeb, vycisteni toku,vymena zatravnovacich tvarnic, rekonstrukce kamennych splavu.
Objem praci: cca 5,0 mil. Kc
Click for photo
Revitalization of the Ponavka-Skrobarny water stream
Training of stream bed, demolition of the existing slope protection, sediment removing, concrete foot, concrete embedded quarry stone pavement.
Volume of work: ca CZK 5 mill.
HP Flood pool Fialska
Complete renovation of the pool incl. new emergency weir, training of the stream bed below dam
Volume of work ca CZK 4 mill.
Click for photo
YEAR 2005
Revitalization project Herkle Tasky
complete flood pool construction
Volume of work ca CZK 2.5 mill.
HB Polomina
water stream training, silt removing, repair of tears, slope treatment, lattice fence
Volume of work ca CZK 5 mill.
Ostravice-Frydlant, km 37,500-39,300
Renovation and raising the dam, road construction at the dam top
Volume of work: ca CZK 3 mill.
Olesna, Paskov, km 1,015-2,460
Training of stream bed, wood cutting and new plantation, lowering the gradient drop, new emergency profile
Volume of work ca CZK 2 mill.
Trebovka, Hvezda pond
Complete renovation of the reservoir, with a new dam of 30 thousand m3 area, removing of ca 60 thousand m3 of silt, concrete embedded pavement, rockfill, refurbishment of the bypass lead
Volume of work: CZK 15 mill.
Rajecsky stream
Range of work: training of stream bed, pavement repair, stone blocks, stream bed cleaning, backfill and finish of the face.
Volume of work ca CZK 1.5 mill.
YEAR 2004
VD Mirejovice - repair of reservoirs
Drift removing, repair of tears in the Vltava riverbed, rockfill, backfill foot, concrete embedded pavement
Volume of work ca CZK 4 mill.
HB Veselsky stream
Water stream training in the municipality, sediment removing, training of stream bed, concrete embedded paving, facework, rockfill, backfill
Volume of work ca CZK 2.5 mill.
Click for photo
Flood damage - Slapy water reservoir, slope repair and stabilization
Repair of the slope protection below the Slapy reservoir, flood control measures, 10 thousand m3 of rockfill with wedging
Volume of work: CZK 6 mill.
Zablati u Osove Bitysky pond – silt removing
ORemoving of silt, repair of outlet equipment
Volume of work ca CZK 2 mill./p>
Udoli lasky pond – silt removing and repair
Removing of silt, repair of outlet equipment, repair of dam, revegetation
Volume of work ca CZK 4 mill.
YEAR 2003
Flood damage - Vrane nad Vltavou
Bringing in and laying quarry stone - backfill foot, rockfill
Volume of work: CZK 6 mill.
Click for photo
Flood damage repairs, Veltrusy
Removing drift from the river Vltava, slope stabilization with quarry stone, concrete embedded pavement, rockfill with wedging
Volume of work: CZK 5 mill.
Flood damage - Vernirovice
Training of the stream bed-rockfill, backfill, wire-stone protection
Volume of work: CZK 3 mill.
Click for photo
Lhotsky stream
Removing drift from the stream, slope stabilization with quarry stone, construction of stabilization blocks of quarry stone, embedding grassing blocks, revegetation
Volume of work: CZK 4.5 mill.
Transport constructions
YEAR 2007
Road in Zetor
construction of new roads and parking, interlocking pavement, bitumen in the premises of the company Zetor,
value: 3 mill. CZK
Brnenka Ivancice
all and any roads and distribution networks in the new development of family houses.
Value: 10 mill. CZK
Revitalization of industrial estate, Fulnek
Earthwork, demolition work, construction of new roads of interpaver stones and bitumen on the estate incl. drainage
Volume of work: CZK 15 mill.
YEAR 2006
Road, Skrchov
Complete construction of a new road
Volume of work: ca CZK 2 mill.
Country roads, Vemyslice
Construction of new country roads of crusher-run material and bitumen incl. drainage
Volume of work: ca CZK 6 mill.
Click for photo
Technological centre VF Cerna Hora
Construction of new roads of interpaver stones and bitumen in the complex, incl. drainage
Volume of work: CZK 3 mill.
Extension of Zarosice gymnasium
Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: CZK 2 mill.
YEAR 2005
Makro Praha road, Black Bridge
Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: ca CZK 6 mill.
Roads, Paskov
Construction of new bitumen access road
Volume of work: ca CZK 4 mill.
Roads, Petrovice
Construction of new roads of interpaver stones and bitumen in the complex, incl. drainage
Volume of work: ca CZK 3 mill.
YEAR 2004
Flat blocks-Pisecna
Complete construction of new roads in the complex
Volume of work: CZK 3 mill.
ASMO Zruc nad Sazavou
Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: CZK 10 mill.
YEAR 2003
Cycle paths, Domasov
Construction of new fieldpaths from mineral concrete, bridge renovation
Volume of work: ca CZK 5 mill.
Hall of the Faculty Hospital, Brno-Polni
Complete construction of new roads in the complex
Volume of work: ca CZK 5 mill.
Flat blocks -Vavrinecka
Complete construction of new roads in the complex
Volume of work: CZK 2 mill.
Road II/374 Rajec
Construction of a new embankment slope for a new road
Volume of work: CZK 10 mill.
Ecological constructions
YEAR 2007
Reclamation of Zivotice dump
Reclamation of domestic waste dump
Volume of work: CZK 18 mill.
Click for photo
YEAR 2005
Dump, Hradcany
Reclamation of domestic waste dump
Volume of work: CZK 4 mill.
YEAR 2004
Waste management Rapotin
Reclamation of domestic waste dump
Volume of work: CZK 6 mill.
Ground works, demolitions
YEAR 2007
KIKA Sport Brno
Site preparation, earthwork
Volume of work: CZK 5 mill.
Cooper Zdar nad Sazavou
Site preparation, earthwork, ground slab in the hall
Volume of work: CZK 8 mill.
Apartment House Cenka Ruzicky, Brno
demolition and ground works on turn key
Value 10 mil.
YEAR 2006
Hortim re-shipping hall, Brno
Site preparation, earthwork, gravel layers
Volume of work: CZK 8 million
Eden Purkynova
Site preparation, earthwork
Volume of work: CZK 4.0 million
Click for photo
YEAR 2005
DAIKIN Brno
Site preparation, earthwork, ground slab in the hall,
Volume of work: CZK 15 mill.
YEAR 2004
ASMO Zruc nad Sazavou
Site preparation, earthwork, utility services, roads, ground slab in the hall, complete substructure.
Volume of work: CZK 30 million
PHOENIX ZEPPELIN Brno
Site preparation, earthwork, gravel layers
Volume of work: CZK 8 million
YEAR 2003
Interspar Brno-Cejl
Range of work: earthwork, demolition work, contaminated waste disposal
Volume of work: CZK 12 mill.