References

Water management constructions

YEAR 2007

Lubnik, erosion control construction

Construction of the complete flood pool including emergency weir, relocation of HV installations, greenery setting.
Volume of work ca CZK 8.0 million

Lesetinsky Stream

construction of flood controls – earth fill dam and reinforced concrete dam, gradient of stonework, construction of a new road.
Value: 14 mill. CZK

Mnisi Stream

regulation and adaptation of stream course, pavement of quarry stone, walls of face work, stone thresholds, rockfill (chinking),
value: 3 mill. CZK

RN Ramaska

complex construction if a new water reservoir,
value: 3 mill. CZK

Kreslicky Stream

complete construction of flood controls – wire and stone dams, stone dams of face work, rockfill (chinking), riprap, stream course adaptation,
value: 6 mill. CZK

HB Nelepec

flood controls – wire and stone course reinforcement, stone dams of face work,
value: 2,5 mill. CZK

YEAR 2006

Revitalization project in Dukovany flood plain

Complete construction of a new reservoir incl. emergency weir and pool, riverbed training
Volume of work ca CZK 2.5 mill.
Click for photo

HB Vavrovsky stream

Water stream training, sediment removing, training of the stream bed, facework, rockfill of quarry stone
Volume of work ca 2 mill. CZK

HB Plenkovicky stream

Water stream training, slope stabilization, rockfill of quarry stone, revegetation
Volume of work ca CZK 1 mill.

Lateral canal Vranany-Horin, repair of bank protection

repair and refilling of the backfill foot, refilling of scours and depressions in the banks, repair and extension of stone pavement, stone backfilling, new pavement of concrete embedded quarry stone, approx. 6 thousand m2
Volume of work: CZK 8 mill.

Right-hand bank of the river Ricky, km 29,000-RN, km 2,650

Construction of the complete flood pool, incl. emerg. weir, water stream training, sediment removing, riverbed training, quarry stone backfill, revegetation
Volume of work ca CZK 2 mill.

HB Flood pool Podbrdi, Podkopna Lhota

Construction of the complete flood pool
Volume of work ca CZK 4 mill.

OHB Boracsky stream

Repair of the stream bed, sediment removing, repair of the existing pavement, construction of the new stone damming
Volume of work ca CZK 3 mill.

MVN Vavrinec renovation

Renovation of the reservoir in the village, volume of work ca CZK 1 mill.

HB Lazanka in Lazany

Repair of the stream bed, repair and extension of the existing stone pavement, stream cleaning, replacement of grassing blocks, renovation of stone weir.
Volume of work: ca CZK 5 mill.

OHB Vrbovec

Oprava koryta potoka, oprava a doplneni stavajicich kamennych dlazeb, vycisteni toku,vymena zatravnovacich tvarnic, rekonstrukce kamennych splavu.
Objem praci: cca 5,0 mil. Kc
Click for photo

Revitalization of the Ponavka-Skrobarny water stream

Training of stream bed, demolition of the existing slope protection, sediment removing, concrete foot, concrete embedded quarry stone pavement.
Volume of work: ca CZK 5 mill.

HP Flood pool Fialska

Complete renovation of the pool incl. new emergency weir, training of the stream bed below dam
Volume of work ca CZK 4 mill.
Click for photo

YEAR 2005

Revitalization project Herkle Tasky

complete flood pool construction
Volume of work ca CZK 2.5 mill.

HB Polomina

water stream training, silt removing, repair of tears, slope treatment, lattice fence
Volume of work ca CZK 5 mill.

Ostravice-Frydlant, km 37,500-39,300

Renovation and raising the dam, road construction at the dam top
Volume of work: ca CZK 3 mill.

Olesna, Paskov, km 1,015-2,460

Training of stream bed, wood cutting and new plantation, lowering the gradient drop, new emergency profile
Volume of work ca CZK 2 mill.

Trebovka, Hvezda pond

Complete renovation of the reservoir, with a new dam of 30 thousand m3 area, removing of ca 60 thousand m3 of silt, concrete embedded pavement, rockfill, refurbishment of the bypass lead
Volume of work: CZK 15 mill.

Rajecsky stream

Range of work: training of stream bed, pavement repair, stone blocks, stream bed cleaning, backfill and finish of the face.
Volume of work ca CZK 1.5 mill.

YEAR 2004

VD Mirejovice - repair of reservoirs

Drift removing, repair of tears in the Vltava riverbed, rockfill, backfill foot, concrete embedded pavement
Volume of work ca CZK 4 mill.

HB Veselsky stream

Water stream training in the municipality, sediment removing, training of stream bed, concrete embedded paving, facework, rockfill, backfill
Volume of work ca CZK 2.5 mill.
Click for photo

Flood damage - Slapy water reservoir, slope repair and stabilization

Repair of the slope protection below the Slapy reservoir, flood control measures, 10 thousand m3 of rockfill with wedging
Volume of work: CZK 6 mill.

Zablati u Osove Bitysky pond – silt removing

ORemoving of silt, repair of outlet equipment
Volume of work ca CZK 2 mill./p>

Udoli lasky pond – silt removing and repair

Removing of silt, repair of outlet equipment, repair of dam, revegetation
Volume of work ca CZK 4 mill.

YEAR 2003

Flood damage - Vrane nad Vltavou

Bringing in and laying quarry stone - backfill foot, rockfill
Volume of work: CZK 6 mill.
Click for photo

Flood damage repairs, Veltrusy

Removing drift from the river Vltava, slope stabilization with quarry stone, concrete embedded pavement, rockfill with wedging
Volume of work: CZK 5 mill.

Flood damage - Vernirovice

Training of the stream bed-rockfill, backfill, wire-stone protection
Volume of work: CZK 3 mill.
Click for photo

Lhotsky stream

Removing drift from the stream, slope stabilization with quarry stone, construction of stabilization blocks of quarry stone, embedding grassing blocks, revegetation
Volume of work: CZK 4.5 mill.



Transport constructions

YEAR 2007

Road in Zetor

construction of new roads and parking, interlocking pavement, bitumen in the premises of the company Zetor,
value: 3 mill. CZK

Brnenka Ivancice

all and any roads and distribution networks in the new development of family houses.
Value: 10 mill. CZK

Revitalization of industrial estate, Fulnek

Earthwork, demolition work, construction of new roads of interpaver stones and bitumen on the estate incl. drainage
Volume of work: CZK 15 mill.

YEAR 2006

Road, Skrchov

Complete construction of a new road
Volume of work: ca CZK 2 mill.

Country roads, Vemyslice

Construction of new country roads of crusher-run material and bitumen incl. drainage
Volume of work: ca CZK 6 mill.
Click for photo

Technological centre VF Cerna Hora

Construction of new roads of interpaver stones and bitumen in the complex, incl. drainage
Volume of work: CZK 3 mill.

Extension of Zarosice gymnasium

Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: CZK 2 mill.

YEAR 2005

Makro Praha road, Black Bridge

Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: ca CZK 6 mill.

Roads, Paskov

Construction of new bitumen access road
Volume of work: ca CZK 4 mill.

Roads, Petrovice

Construction of new roads of interpaver stones and bitumen in the complex, incl. drainage
Volume of work: ca CZK 3 mill.

YEAR 2004

Flat blocks-Pisecna

Complete construction of new roads in the complex
Volume of work: CZK 3 mill.

ASMO Zruc nad Sazavou

Construction of new roads and a car park of interpaver stones and bitumen incl. drainage
Volume of work: CZK 10 mill.

YEAR 2003

Cycle paths, Domasov

Construction of new fieldpaths from mineral concrete, bridge renovation
Volume of work: ca CZK 5 mill.

Hall of the Faculty Hospital, Brno-Polni

Complete construction of new roads in the complex
Volume of work: ca CZK 5 mill.

Flat blocks -Vavrinecka

Complete construction of new roads in the complex
Volume of work: CZK 2 mill.

Road II/374 Rajec

Construction of a new embankment slope for a new road
Volume of work: CZK 10 mill.



Ecological constructions

YEAR 2007

Reclamation of Zivotice dump

Reclamation of domestic waste dump
Volume of work: CZK 18 mill.
Click for photo

YEAR 2005

Dump, Hradcany

Reclamation of domestic waste dump
Volume of work: CZK 4 mill.

YEAR 2004

Waste management Rapotin

Reclamation of domestic waste dump
Volume of work: CZK 6 mill.



Ground works, demolitions

YEAR 2007

KIKA Sport Brno

Site preparation, earthwork
Volume of work: CZK 5 mill.

Cooper Zdar nad Sazavou

Site preparation, earthwork, ground slab in the hall
Volume of work: CZK 8 mill.

Apartment House Cenka Ruzicky, Brno

demolition and ground works on turn key
Value 10 mil.

YEAR 2006

Hortim re-shipping hall, Brno

Site preparation, earthwork, gravel layers
Volume of work: CZK 8 million

Eden Purkynova

Site preparation, earthwork
Volume of work: CZK 4.0 million
Click for photo

YEAR 2005

DAIKIN Brno

Site preparation, earthwork, ground slab in the hall,
Volume of work: CZK 15 mill.

YEAR 2004

ASMO Zruc nad Sazavou

Site preparation, earthwork, utility services, roads, ground slab in the hall, complete substructure.
Volume of work: CZK 30 million

PHOENIX ZEPPELIN Brno

Site preparation, earthwork, gravel layers
Volume of work: CZK 8 million

YEAR 2003

Interspar Brno-Cejl

Range of work: earthwork, demolition work, contaminated waste disposal
Volume of work: CZK 12 mill.